Undergraduate Academic Catalog 2012-2013
Home > Undergraduate Academic Catalog 2012-2013 > Degree Course Descriptions > Course Descriptions > Construction Course Descriptions > CM 3430 Construction Estimating for Development
CM 3430 Construction Estimating for Development
Prerequisite: CM 3410
2-2-3
A study of quantity take-off techniques and equipment productivity analysis necessary to development. Small scale development project budgeting will be analyzed from the developer viewpoint. Initial conceptual design budget is based on square foot or assembly pricing for the various construction systems and detailed estimate for the infrastructure costs including site work and utilities. Indirect costs associated with zoning, local codes, and ordinances, as well as soft cost associated with design and engineering will be discussed.
|
Up one level: |
Table of Contents
Catalog Links
Privacy Policy | A-Z Index | About Us | Contacts | Maps | Ethics and Reporting Hotline | Emergency Info | Text Only
© Southern Polytechnic State University. All Rights Reserved
1100 South Marietta Pkwy Marietta, GA 30060-2896 | Phone: 678-915-7778 Toll Free: 800-635-3204