Action Plan Implemented
Approved By Dean ACC
Based on Assessment Outcomes of FY 2006
Jim Mullinax
2000 Constriction Graphics:
Students to have originals of required text for exercises or bound photocopies.
Policy clarified on grades for missed tests and make-ups.
3310 Development Planning (Introduction to Dev.)
Policy clarified on grades for missed tests and make-ups.
3710 Site Planning
Policy clarified on grades for missed tests and make-ups.
4570 Development Process I
Policy clarified on grades for missed tests and make-ups.
Test weightings changed
Assignments added to syllabus
4620 Development Process II
Capstone references added
Policy clarified on grades for misses tests and make-ups.
Policy on final grades being e-mailed stated.
4770 Development Law
Policy clarified on grades for missed tests and make-ups.
Grade weightings restated
Policy on final grades being e-mailed stated.
Dunn exercises and reading assignments added
John Mench
Construction Finance and Feasibility CNST 3620: The capstone outcome comments indicated a need for better understanding of Construction finance.
Zuhair El-Itr
CNST 3410
I will add a signature sheet stating that
“I__________________ have read the Syllabus for CNST 3410. I fully understand the class requirements as well as the grading policy.
Signed:____________________________”
Attendance Policy:
I will change the attendance requirement: “Students are required to attend every class. However if they have to miss a class for any reason it is their responsibility to catch up with the class material, be aware of any scheduled exam or any announcement. No make up test will be given. The student will always get the three best scores of the four scheduled exams.
Other Class Requirements:
I will change the other class requirements to read as follows: “It is a Class requirement that each student have at all time a basic calculator, a Civil and Architectural scale, and that each Team has their project’s blue print.”
CNST 3420
Signature sheet:
I will add a signature sheet stating that
“I__________________ have read the Syllabus for CNST 3420. I fully understand the class requirements as well as the grading policy.
Signed:____________________________”
Attendance Policy:
I will change the attendance requirement: “Students are required to attend every class. However if they have to miss a class for any reason it is their responsibility to catch up with the class material, be aware of any scheduled exam or any announcement. No make up test will be given.
Project Submittal
A new section will be added to have a submittal or a sign up around Midterm. This will read as follows:
“Each Team should schedule a time to get a 50% signup on their project. At the time of signup the following issues should be accomplished:
1. Skeleton Estimate format in place
2. Quantity Survey Complete
CNST 3430
Signature sheet:
I will add a signature sheet stating that
“I__________________ have read the Syllabus for CNST 3430. I fully understand the class requirements as well as the grading policy.
Signed:____________________________”
Attendance Policy:
I will change the attendance requirement: “Students are required to attend every class. However if they have to miss a class for any reason it is their responsibility to catch up with the class material, be aware of any scheduled exam or any announcement. No make up test will be given.
Project Submittal
A new section will be added to have a submittal or a sign up around Midterm. This will read as follows:
“Each Team should schedule a time to get a 50% signup on their project. At the time of signup the following issues should be accomplished:
3. Skeleton Estimate format in place
4. Quantity Survey Complete
Javier Irizarry, Ph.D.
Re: Changes to Course Syllabi of Fall 2006 Based on Capstone Outcome Assessment of Fall 2005
According to the Capstone Outcome Assessment (Fall 2005) that was provided I make the following recommendations for changes to my courses syllabi
CNST 3000 - Computer Applications in Construction
For CNST 3000 Computer Applications in Construction I propose the following changes to the course syllabus:
For CNST 3000 Computer Applications in Construction I propose the following changes to the course content:
CNST 3500 - Building Codes
For CNST 3500 Building Codes I propose the following changes to the course syllabus:
For CNST 3500 Building Codes I propose the following changes to the course content:
CNST3110 - Building Techniques and Methods I
For CNST 3110 - Building Techniques and Methods I, I propose the following changes to the course syllabus:
For CNST 3110 - Building Techniques and Methods I, I propose the following changes to the course content:
Brian Moore
CNST 1000
In response to outcomes assessment conducted during Fall 2005, the following changes were made to the CNST 1000 course:
Outcomes assessments indicated that the textbook for this course was not satisfactory. As a result, an implementation plan was prepared in Fall 2005 that would replace the textbook.
The textbook replacement plan has been implemented and includes student subscriptions to ENR magazine, which is published weekly by McGraw-Hill. This approach exposes the students to current information about the field of construction in and outside of the United States. This publication familiarizes students with cost, safety, legal, environmental, and other issues critical to the construction manager.
In addition to class discussions that draw on ENR topics, quizzes have been added to the CNST 1000 course to ensure that students are indeed reading the ENR magazines.
Finally, students are reminded that courses that they will be taking in the Construction curriculum will ultimately lead them to their Senior Capstone course (CNST 4900). They are regularly encouraged to prepare themselves for CNST 4900 and to not lose sight of their ultimate goal.
CNST 4900
In response to outcomes assessment conducted during Fall 2005, the following changes were made to the CNST 4900 Capstone course:
A faculty sign-off sheet was added to the list of requirements – This ensures that each student sees a faculty member when they are approximately 30% and 75% complete with that portion of their project and that the faculty member is satisfied with the work that is being done. The faculty sign-off sheet was added to the syllabus for the course to further support it as a requirement.
In the past, the Capstone Handbook was either available only in hardcopy format, or was difficult to print in its online version. The Capstone Handbook is now available to students on the Construction web site and in “pdf” format. This increases the likelihood that students will print the handbook and be more familiar with the requirements of the course than in the past.
A “Capstone Statement of Understanding” (CSU) was also instituted. The CSU identifies specific milestone items and due dates. Students sign this agreement which places the burden of complying with the course requirements on their shoulders. The signature portion of the CSU reads “By signing this statement of understanding, I signify that I have read the capstone handbook and syllabus for this semester and understand the requirements for completion of this course.”
As indicated in the Sept. 2005 Implementation Plan, these actions are hoped to increase student awareness of the requirements of the Capstone course and increase the amount of student/faculty interaction during the course.
John Mench
Revised Project Financials for Capstone
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
$750,000 and 8 months |
Project begins on Sept 1st the first bill is sent to owner on 25 Sept. |
|
|
|
|
||||||||
|
The owner will pay in thirty days. |
|
|
|
|
|
|
|
|
|
|
|
||
|
The subcontractors will bill on the 1st of Oct and be pay 5 days after the GC is paid. |
|
|
|
|
|
||||||||
|
The owner will hold 10% retainage until the project is completed. |
|
|
|
|
|
|
|
||||||
|
The subcontractors will be paid 75 percent and retainage will be 7% and paid at completion. |
|
|
|
|
|||||||||
|
The cost of money is 1% per month |
|
|
|
|
|
|
|
|
|
|
|||
|
All Numbers in 1000's of dollars |
|
|
Year |
|
|
|
|
|
|
Year 2 |
Total |
||
|
|
Sept |
Oct |
Nov |
Dec |
End |
Jan |
Feb |
Mar |
Apr |
May |
Jun |
End |
Project |
|
Direct Costs |
47.5 |
57.5 |
84 |
106.5 |
295.5 |
106.5 |
84 |
61.5 |
52.5 |
0 |
0 |
304.5 |
600 |
|
Indirect Costs |
20 |
10 |
6 |
6 |
42 |
6 |
6 |
6 |
6 |
9 |
0 |
33 |
75 |
|
Dir. + Ind. Costs |
67.5 |
67.5 |
90 |
112.5 |
337.5 |
112.5 |
90 |
67.5 |
58.5 |
9 |
0 |
337.5 |
675 |
|
Markup |
7.5 |
7.5 |
10 |
12.5 |
37.5 |
12.5 |
10 |
7.5 |
7.5 |
0 |
0 |
37.5 |
75 |
|
Billed |
75 |
75 |
100 |
125 |
375 |
125 |
100 |
75 |
75 |
|
0 |
375 |
750 |
|
Retainage |
7.5 |
7.50 |
10 |
12.50 |
37.5 |
12.5 |
10 |
7.5 |
7.5 |
0 |
0 |
37.5 |
75 |
|
Received |
0 |
67.50 |
67.50 |
90.00 |
225 |
112.50 |
112.5 |
90 |
67.5 |
142.5 |
0 |
525 |
750 |
|
Sub Billing |
25 |
56.25 |
77.25 |
102 |
260.5 |
101.8 |
80.75 |
60 |
59.5 |
|
0 |
302 |
562.5 |
|
Sub Retainage |
1.75 |
3.94 |
5.41 |
7.14 |
18.24 |
7.12 |
5.65 |
4.20 |
4.17 |
0.00 |
0.00 |
21.14 |
39.38 |
|
Paid to Sub |
0 |
23.25 |
52.31 |
71.84 |
147.4 |
94.86 |
94.63 |
75.10 |
55.80 |
55.34 |
39.38 |
415.1 |
562.5 |
|
G & A 4% |
3 |
3 |
4 |
5 |
15 |
5 |
4 |
3 |
3 |
0 |
0 |
15 |
30 |
|
Project Indirect |
20 |
10 |
6 |
6 |
42 |
6 |
6 |
6 |
6 |
9 |
0 |
33 |
75 |
|
Self Perform |
3.75 |
3.75 |
5 |
6.25 |
18.75 |
6.25 |
5 |
3.75 |
3.75 |
0 |
0 |
18.75 |
37.5 |
|
Line of Credit |
-26.75 |
27.50 |
0.19 |
0.91 |
1.85 |
0.39 |
2.87 |
2.15 |
-1.05 |
78.17 |
-39.38 |
|
|
|
Interest $ |
-0.27 |
0 |
0 |
0 |
-0.27 |
|
|
0.02 |
-0.01 |
|
-0.39 |
-0.38 |
-0.65 |
|
Monthly Income |
-27.02 |
27.50 |
0.19 |
0.91 |
1.58 |
0.39 |
2.87 |
2.17 |
-1.06 |
78.17 |
-39.77 |
42.77 |
44.35 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Income Statement Yr 1 |
|
Income Statement Yr 2 |
|
|
Income Statement Total Project |
|
|
|
|
|
|||
|
Revenue |
375 |
|
Rev |
375 |
|
|
Rev |
750 |
|
|
|
|
|
|
Sub Expense |
260.5 |
|
S Exp |
302 |
|
|
S Exp |
562.5 |
|
|
|
|
|
|
Proj. Ind. Exp. |
42 |
|
PIE |
33 |
|
|
PIE |
75 |
|
|
|
|
|
|
Self Perform |
18.75 |
|
SP |
18.75 |
|
|
SP |
37.5 |
|
|
|
|
|
|
Proj. (rev-exp) |
53.75 |
|
R-E |
21.25 |
|
|
R-E |
75 |
|
|
|
|
|
|
(G & A) |
15 |
|
G&A |
15 |
|
|
G&A |
30 |
|
|
|
|
|
|
Interest |
-0.27 |
|
Int |
-0.38 |
|
|
Int |
-0.65 |
|
|
|
|
|
|
Gross Income |
38.48 |
|
G IC |
5.87 |
|
|
G IC |
44.35 |
|
|
|
|
|
|
Tax 40% |
15.39 |
|
Tax |
2.34691 |
|
|
Tax |
17.74 |
|
|
|
|
|
|
Net Income |
23.09 |
|
Net IC |
3.52 |
|
|
|||||||